Posts

Showing posts from March, 2021

Cowling and skybolts

Image
Starting by matching both upper and lower halves Locating holes and drilling Skybolts Making the scope removable using skybolts Oil door: Oildoor completed:

VOR antenna installed

Image
 We were lucky to have Hafiz in the workshop!! Together we installed the VOR antenna on top of the VS Completed and installed: